Atlanta International School – AIS Spring Benefit: Passport to Germany
Auction Ends: Apr 10, 2011 08:00 PM EDT

Real World Experience

Spend a Day with a Construction Project Manager

Item Number
9933
Estimated Value
Priceless
Sold
110 USD to dcbids
Number of Bids
4  -  Bid History

Item Description

Jacobs Engineering Group is currently providing construction oversight of a rehabilitation project by Archer Western Contractors at Cobb County-Marietta Water Authority's James E. Quarles Water Treatment Plant.  The project generally consists of rehabilitation of existing facilities including Flocculation Basins, Sedimentation Basins, and Filters; repairs to an existing 6-MG Clearwell; new 6-MG Clearwell (prestressed type); variable speed drive addition to one pump in High Service Pump Station; Underdrain Pump Station improvements, including new pumps, variable speed drive controls and piping; chemical building improvements; new Washwater Splitter Box, new Washwater Pump Station No. 2, and new Washwater Clarifier; replacement of traveling bridge with new rectangular clarifier mechanism in existing Washwater Clarifier; replacement of piping and valves in Washwater Pump Station; replacement of pumps and piping in Sludge Pump Station; structural modifications to the Chemical Building, Filter Complex, Filter Press Building and High Service Pump Station; storm drain rehabilitation with cured-in-place pipe method; yard piping for new and existing facilities; electrical system improvements to support new loads; computer-based controls associated with improvements; remote site telemetry upgrades; site development and storm water management.

Item Special Note

Grades 9 - 11 only; Expires May 27, 2011; One person maximum with the physical ability to walk a construction site.  Personal protective equipment (e.g., hard hats, vests, glasses, etc.) will be provided and will need to be used.